...
首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Woodside boss speaks out over Karratha toll delays
【24h】

Woodside boss speaks out over Karratha toll delays

机译:Woodside Boss讲述了Karratha收费延误

获取原文
获取原文并翻译 | 示例
           

摘要

THE chief executive of Australian operator Woodside Petroleum has voiced his frustration over negotiations dragging out for tolling arrangements for its proposed Browse and Scarborough developments in Western Australia. A tolling agreement for the North West Shelf joint venture's Karratha gas plant is needed for Woodside and its partners to make a final investment decision for the development of the Browse gas resource. An arrangement had been expected by mid-year. However, in June, Woodside chief Peter Coleman revealed talks had been reset with the view of having a specific Browse agreement in place by the time the project enters front-end engineering and design towards the end of 2019.
机译:澳大利亚操作员伍德赛德石油的行政长官在拖欠澳大利亚议会浏览和斯卡伯勒发展的促进安排时,他对谈判进行了挫折。伍德赛德及其合作伙伴需要为西北西部合资企业Karratha天然气厂进行收费协议,以对浏览燃气资源开发的最终投资决定。在年中期预期的安排。然而,在6月份,Woodside首席彼得科尔曼透露谈判已被重置,并且在项目进入2019年底前端工程和设计的特定浏览协议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号