【24h】

Canacol to drill at VIM 5

机译:Canacol在Vim 5钻

获取原文
获取原文并翻译 | 示例
       

摘要

CANADIAN independent Canacol Energy is planning to drill additional wells on its blocks in the Lower Magdalena Valley basin in Colombia after its work so far has paid off following testing. The second well on the 100% Canacol-owned VIM 5 block, the Ocarina 1 well, encountered a thick section of gas pay within the Cienaga de Oro (CDO) sandstone reservoir. Using the Pioneer 53 drilling rig, the well reached a total depth of 8751 feet (2667 metres) measured depth and encountered 530 feet of gross gas pay. It tested at a rate of 30 million cubic feet per day. Canacol said its drilling has confirmed "a significant new accumulation of gas within the CDO".
机译:加拿大独立Canacol能源正计划在哥伦比亚在哥伦比亚的下部Magdalena Valley盆地钻取额外的井,到目前为止已经退还了以下测试。在100%Canacol拥有的Vim 5块上,ocarina 1井,遇到了Cienaga de Oro(CDO)砂岩储层内的厚圆形工资。使用先锋53钻机,良好的总深度为8751英尺(2667米)测量深度,遇到了530英尺的总煤气工资。它以每天3000万立方英尺的速度测试。 Canacol表示,它的钻井已经证实了“CDO内的大量气体积累”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号