【24h】

Rig drops BOP stack

机译:钻机掉落防喷器堆栈

获取原文
获取原文并翻译 | 示例
       

摘要

VALARIS is investigating what caused the blowout preventer stack to fall off its DS-8 drill-ship while the rig was moving between well locations off Angola earlier this week. The BOP stack disconnected from the riser and dropped to the sea floor, "clear of any sub-sea structures", on 7 March, the rig owner said. Valaris said the errant equipment has been found and the company is "actively working on ways" to recover or replace it so drilling can resume. The company said there were no injuries, environmental pollution or third-party damage.
机译:VALARIS正在调查是什么原因导致本周早些时候钻机在安哥拉附近的井场之间移动时,防喷器烟囱从DS-8钻井船上掉下来的原因。钻机所有者称,防喷器从3月7日起与立管断开连接并掉落到海底,“没有任何海底结构”。瓦拉里斯说,已经发现了错误的设备,该公司正在“积极研究”回收或更换设备的方式,以便继续进行钻探。该公司表示,没有造成人员伤亡,环境污染或第三方损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号