首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Two make it to final hurdle in Shwe chase
【24h】

Two make it to final hurdle in Shwe chase

机译:两个人成为瑞追的最后障碍

获取原文
获取原文并翻译 | 示例
           

摘要

SOUTH Korean operator Posco Daewoo has short-listed two contractors in the final race to provide front-end engineering and design services for the third phase development of its Shwe gas project off Myanmar. Well-placed sources said that Posco Daewoo has recommended McDermott of the US and South Korea's Hyundai Heavy Industries to state-owned Myanma Oil & Gas Enterprise (MOGE) for its consideration and required approval. Sources said that Hyundai is partnering with compatriot Daewoo Shipbuilding & Marine Engineering (DSME), which it is trying to acquire, in the joint bid.
机译:韩国运营商浦项大宇(Posco Daewoo)在最后一轮比赛中入围了两家承包商,为其缅甸外的Shwe天然气项目的三期开发提供前端工程和设计服务。消息灵通的消息人士称,浦项大宇已将美国和韩国现代重工的麦克德莫特推荐给国有的缅甸石油天然气企业(MOGE),以供其考虑并需要批准。消息人士称,现代汽车正与同胞大宇造船与海洋工程公司(DSME)合作,共同竞购该企业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号