首页> 外文期刊>Tunnels & tunnelling international >EPBM stands test of sands UNDER PERTH
【24h】

EPBM stands test of sands UNDER PERTH

机译:EPBM经珀斯测试

获取原文
获取原文并翻译 | 示例
       

摘要

Richard Milton, project manager with Transfield Tunnelling, describes how an EPBM and effective partnering proved a successful combination on the most technically challenging section of Perth's main sewer replacement project, with 1.3 km length of major works constructed with minimal disruption. Perth, capital city of Western Australia, has historically had ample space for infrastructure works because of its low population density. As a result, underground services were traditionally constructed using surface excavations that were cost effective and had minimal impact on the community. However, the city's population of 1.4 million people is expanding, putting pressure on existing services.
机译:Transfield Tunnelling的项目经理Richard Milton介绍了EPBM和有效的合作伙伴如何在珀斯主要下水道更换项目中最具技术挑战性的部分成功完成了成功的结合,并在1.3公里长的主要工程中实现了最小的破坏。珀斯是西澳大利亚州的首府,由于人口密度低,历史上有足够的基础设施建设空间。因此,传统上,地下服务是使用地面开挖建造的,这种开挖具有成本效益,并且对社区的影响最小。但是,该市140万人的人口正在扩大,这给现有服务带来了压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号