首页> 外文期刊>Tunnels & tunnelling international >In at the deep end - Part two
【24h】

In at the deep end - Part two

机译:在最深处-第二部分

获取原文
获取原文并翻译 | 示例
       

摘要

Continuing from the January issue, Maurice Jones reports on the tunnel boring progress, lining, cross-passage construction and surface facilities for the Westerscheldetunnel project.rnThe TBM for Westerschelde tunnel's west bore started work three months after that for the east bore, but ground problems there have resulted in it overtaking its twin. When T&TI visited the site at the end of October, the west bore TBM had progressed 2000m and the east bore 1600m. Current progress averages seven rings a day for both machines, or 14m, on a planned 6-day week, 24h a day.
机译:继1月刊之后,莫里斯·琼斯(Maurice Jones)报告了Westerscheldetunnel项目的隧道钻孔进度,衬砌,交叉通道建设和地面设施。rnWesterschelde隧道西钻孔的TBM在东钻孔的三个月后开始工作,但存在地面问题导致它超越了它的孪生兄弟。当T&TI在10月底访问该站点时,西钻孔TBM前进了2000m,东钻孔1600m。在计划的六天工作日(每天24小时)中,两台机器的平均当前进度为每天七次振铃,即1400万次。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号