The A2 motorway is one of the major transport and trade links between Eastern and Southern Europe (figure 1). The existing 2km long Herzogberg tunnel is situated along the route in the mountainous region of the Koralpe, approximately 30km to the south-west of Graz, Austria. This NATM tunnel, with portals situated at an elevation of approximately 945m asl, and a maximum overburden of 145m, is part of a 22km long stretch of the motorway, constructed in the 1970s. The dramatic increase in traffic to approximately 20,000 vehicles per day and heightened Alpine road safety standards ultimately led to the decision to upgrade this section. Design of the project started in the mid 1990s, resulting in the 22km long section being divided into three lots. The "Herzogberg" lot is the first to be constructed with an overall length of 4.9km, comprising two bridges (386m and 185m long), 2.4km of open motorway, and a second Herzogberg tunnel tube. The project is funded by ASFINAG (Autobahnen-und Schnellstrassen Finanzierungs Aktienge-sellschaft), a government financing corporation, which transferred the overall project management and the site supervision to the local Styrian authorities (Amt der Steiermaerkischen Landesregierung). Prein-Lechner ZT GmbH provided the design and the tender documents, with the contract finally being awarded to the Herzog-bergtunnel JV, comprising Strabag, Hinteregger & Soehne, Porr Tunnelbau and Oestu-Stettin for US$48.4M. 3G (Gruppe Geotechnik Graz ZT GmbH) provides engineering geological services and consultancy for the client with surveying and geotechnical measurements performed by consultant Geodata GmbH.
机译:A2高速公路是东欧和南欧之间的主要运输和贸易联系之一(图1)。现有的2公里长的Herzogberg隧道位于科拉尔普山区的路线上,距奥地利格拉茨西南约30公里。这条NATM隧道的入口位于海拔约945m处,最高覆盖层为145m,是1970年代建造的22公里长的高速公路的一部分。每天的交通量急剧增加至每天约20,000辆,并提高了Alpine道路安全标准,最终决定升级此部分。该项目的设计始于1990年代中期,将22公里长的路段分为三部分。 “ Herzogberg”地段是第一座总长4.9km的地段,包括两座桥梁(长386m和185m),2.4km的开放高速公路和第二条Herzogberg隧道管。该项目由政府融资公司ASFINAG(Autobahnen-und Schnellstrassen Finanzierungs Aktienge-sellschaft)资助,该公司将整体项目管理和现场监督移交给了当地的施蒂里亚当局(Amt der Steiermaerkischen Landesregierung)。 Prein-Lechner ZT GmbH提供了设计和招标文件,合同最终以4840万美元的价格授予了由Strabag,Hinteregger&Soehne,Porr Tunnelbau和Oestu-Stettin组成的Herzog-bergtunnel合资企业。 3G(Gruppe Geotechnik Graz ZT GmbH)通过咨询公司Geodata GmbH为客户提供工程地质服务和咨询服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号