首页> 外文期刊>Tunnels & tunnelling international >Ground freeze remedy at Hull
【24h】

Ground freeze remedy at Hull

机译:赫尔的地面冻结补救措施

获取原文
获取原文并翻译 | 示例
       

摘要

The Hull flow transfer tunnel was constructed for Yorkshire Water to direct sewage flows to a new treatment works, allowing compliance with the European Union's Urban Wastewater Treatment Directive. Miller Civil Engineering (MCEL), now Morgan EST, was commissioned to design and construct the works, with Arup appointed as project manager. The total scheme value for the tunnel was US$122M. The Conditions of Contract were based on the Institution of Chemical Engineers (IchemE) Model form for Process Plant, Greenbook, which provided a target cost reimbursable contract incorporating 'painshare' and 'gainshare' incentives. The 8.4km transfer tunnel, located along the north bank of the River Humber, was designed to allow untreated effluent to flow by gravity from the existing system to a new treatment works. The 3.6m i.d. tunnel was bored using an EPB TBM. The tunnel was lined with a pre-cast segmental lining comprising a 250mm thick, six piece reinforced tapered ring, fitted with EPDM gaskets.
机译:赫尔水流传输隧道是为约克郡水厂建造的,用于将污水流引至新的处理厂,从而符合欧盟的《城市污水处理指令》。 Miller土木工程公司(MCEL),现为Morgan EST,受委托设计和建造工程,Arup被任命为项目经理。该隧道的总计划价值为1.22亿美元。合同条件基于Greenbook的《加工厂化学工程师学会》(IchemE)模型表,该表提供了包含“分红”和“分红”激励机制的目标成本可偿还合同。位于亨伯河北岸的这条8.4公里长的转运隧道旨在使未经处理的污水通过重力从现有系统流到新的污水处理厂。内径360万隧道使用EPB TBM钻孔。隧道衬有预制的分段衬砌,该衬砌包括250毫米厚的六片增强锥形环,并配有EPDM垫圈。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号