...
首页> 外文期刊>Tunnels & tunnelling international >Tunnelling for the new Lenihan outlet
【24h】

Tunnelling for the new Lenihan outlet

机译:新的Lenihan商店的隧道

获取原文
获取原文并翻译 | 示例
           

摘要

The Lenihan Dam Outlet Modification Project includes the construction of a new tunnel outlet at the Lexington Reservoir, in Los Gatos, California. Owned and operated by the Santa Clara Valley Water District, the Lenihan Dam's original steel lined outlet has buckled over the years, requiring numerous repairs. This led the California Department of Water Resources, Division of Safety of Dams (DSOD) to restrict peak discharge to 2m~3/sec, compared to the previous 11.5m~3/sec. The new conduit will consist of a 1.37m (54") concrete lined steel pipe, sited inside a 610m long maintenance tunnel running through the eastern abutment of Lenihan Dam.
机译:Lenihan大坝出口改造项目包括在加利福尼亚州洛斯加托斯的列克星敦水库建设新的隧道出口。 Lenihan大坝的原始钢衬里出口由圣塔克拉拉河谷水区拥有并经营,多年来一直弯曲,需要大量维修。这导致加利福尼亚水利部大坝安全司(DSOD)将峰值流量限制为2m〜3 / sec,而之前的峰值为11.5m〜3 / sec。新管道将由1.37m(54“)衬砌混凝土的钢管组成,该钢管位于一条610m长的维护隧道内,该隧道贯穿Lenihan大坝的东岸。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号