...
首页> 外文期刊>Tunnels & tunnelling international >TBM breakthroughs for Sao Paulo metro
【24h】

TBM breakthroughs for Sao Paulo metro

机译:圣保罗地铁的TBM突破

获取原文
获取原文并翻译 | 示例
           

摘要

More than two-thirds of the TBM bored section on Line 4 of Sao Paulo Metro has been completed, with shield excavation due to be completed on schedule by next June.rnThe 9.46m diameter EPBM was launched in early 2007 near Faria Lima station and has driven east more than 4,300m, passing through Fradique Coutinho, Oscar Freire, Paulista and Higienopolis-Mackenzie stations.rnSeli's crew driving the Herrenknecht shield for the Odebrecht-led joint venture contractor has been pushing progress since March when it was relaunched after a lengthy stop at Oscar Freire. It reached the station a year ago.
机译:圣保罗地铁4号线的TBM钻孔段的三分之二已经完工,盾构的开挖工作将于明年6月如期完成。直径9.46m的EPBM于2007年初在Faria Lima站附近发射,已经向东行驶超过4,300m,途经Fradique Coutinho,Oscar Freire,Paulista和Higienopolis-Mackenzie站.rnSeli的船员为Odebrecht领导的合资承包商驾驶Herrenknecht盾牌,自3月份以来就一直在推动进展。在奥斯卡·弗莱雷(Oscar Freire)。一年前到达车站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号