首页> 外文期刊>Tunnels & tunnelling international >Gotthard Advances On Tracks Tunnels
【24h】

Gotthard Advances On Tracks Tunnels

机译:圣哥达在轨道隧道上取得进展

获取原文
获取原文并翻译 | 示例
       

摘要

Preparations to implement the recently signed trackwork and equipment contract for the Gotthard Tunnel project are getting underway as excavations and concrete lining works continue to make steady progress. The US$1.5bn trackwork and equipment contract - the last big contract to be awarded on the 57km long twin bore rail project through the Swiss Alps - was awarded just over a year ago to the Transtec Gotthard Consortium. The JV comprises Atel Installationstechnik, Alcatel-Lucent Schweiz, TRSS Thales Rail Signalling Solutions, Alpine-Bau, and Balfour Beatty Rail. It has appointed Poyry to provide engineering services under a US$15.8M contract.
机译:随着挖掘和混凝土衬砌工程的持续稳步发展,正在实施为戈特哈德隧道项目最近签署的轨道工程和设备合同的准备工作正在进行。这项价值15亿美元的轨道工程和设备合同-穿越瑞士阿尔卑斯山的长达57公里的双孔铁路项目上的最后一项重大合同-刚刚一年前授予Transtec Gotthard财团。合资企业包括Atel Installationstechnik,阿尔卡特朗讯Schweiz,TRSS Thales铁路信号解决方案,Alpine-Bau和Balfour Beatty Rail。它已根据1580万美元的合同任命Poyry提供工程服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号