首页> 外文期刊>Tunnels & tunnelling international >Florence rail bores for Seli
【24h】

Florence rail bores for Seli

机译:佛罗伦萨Seli的钢轨孔

获取原文
获取原文并翻译 | 示例
       

摘要

Sell has been awarded a subcontract to use an EPBM to drive two tunnels for a High Speed-High Capacity rail scheme in Florence, Italy.rnA 9.4m diameter EPBM will be used to bore twin, 5.5km long tubes on the north-south section between Florence Rifredi and Florence Campo di Marte. It is to drive northwards, be dismantled at Rifredi and returned to campo di Marte for relaunch.rnGeology along the alignment comprises alluvial sediments, lake deposits and clay. The bores willrnbe lined with 8.30m i.d. segmental rings (6+1) of 400mm thickness.rnThe twin tunnels are to be linked by 13 cross passages spaced at 410m-490m intervals.rnThe main contractor on the project is the Nodavia JV, which includes Coopsette, Ergon Engineering and Contracting Consorzio, and Coestra.
机译:Sell已被授予分包合同,可使用EPBM来驱动两条隧道,以实现意大利佛罗伦萨的高速-高容量铁路计划.rnA直径9.4m的EPBM将用于在南北段钻探5.5公里长的双管在佛罗伦萨·里弗雷迪(Florence Rifredi)和佛罗伦萨·坎普·迪·马尔特之间它是向北行驶,在里弗雷迪(Rifredi)拆除,然后返回坎普迪马特(Campo di Marte)重新发射。沿路线的地质包括冲积沉积物,湖泊沉积物和黏土。孔内衬内径为830万分段环(6 + 1)的厚度为400mm。rn双隧道将由13个横向通道连接,间隔为410m-490m。rn该项目的主要承包商是Nodavia合资公司,包括Coopsette,Ergon Engineering和Contracting Consorzio,和Coestra。

著录项

  • 来源
    《Tunnels & tunnelling international》 |2009年第9期|12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:36:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号