...
【24h】

Asbestos isolation

机译:石棉隔离

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Cesana tunnel, located close to the Italian-French border in Piedmont (North West Italy), is the main structure on the SS24 road improvement works that were planned for the XX Winter Olympic Games. The tunnel has a length of 1860m and is located between a 370m long artificial tunnel and the 1280m long Claviere tunnel along a mountainous road which leads to the picturesque resort. Construction by the Italian-Spanish consortium SIS (SACYR S.A., INC General Contractor S.p.A. and SIPAL) started in March 2005.rnDue to the presence of asbestos-bearing rocks that were unexpectedly discovered during tunnelling, work was suspended at the two excavation fronts in autumn 2006, leaving a 105m stretch of tunnel unexcavated. When the asbestos-bearing rock masses were encountered, the tunnel had been excavated from four fronts simultaneously; two starting from the portals and two from the 290m long access adit (figure 1). In order to isolate the asbestos-bearing rock masses from the remaining parts of the tunnel, two confinement barriers were constructed out of HDPE membrane and fixed onto a frame made out of steel tubes and wooden planks. Access to the face has been provided through two decontaminating filters installed on these barriers.
机译:塞萨纳(Cesana)隧道靠近皮埃蒙特(意大利西北部)的意大利-法国边境,是为第二十届冬季奥运会计划的SS24道路改善工程的主要结构。该隧道长1860m,位于一条370m长的人造隧道和一条1280m长的Claviere隧道之间,沿着一条通往风景如画的度假村的山区道路。意大利-西班牙财团SIS(SACYR SA,INC总承包商SpA和SIPAL)于2005年3月开始施工。rn由于在掘进过程中意外发现了含石棉的岩石,因此秋季的两个挖掘前沿都暂停了工作。 2006年,留下105m的未挖掘隧道。当遇到含石棉的岩体时,隧道是同时从四个前沿开挖的。其中两个是从入口开始的,另外两个是从290m长的通道入口开始的(图1)。为了将含石棉的岩体与隧道的其余部分隔离开,由HDPE膜制成了两个限制屏障,并将其固定在由钢管和木板制成的框架上。通过安装在这些挡板上的两个去污过滤器,可以进入面部。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号