The Achrain Tunnel-a bridge underground

机译:阿钦隧道-地下桥梁

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Observing a construction schedule, which had already been drawn up at the estimation stage, and carrying out sound preparation lead to a linear construction site largely characterised by the lean allocation and eco-nominal use of resources. Despite the simultaneous excavat on work and construction of inner lining, only 50 men were employed in the tunnel.rnThis parallel operation was only made possible by the bridge that was constructed so that it could be used as formwork and equipment bearer and as a concrete dis-distribution beam at the same time.rnConstruction conditions were, of course, also appropriate and the inner lining could be constructed without obstruction from ventilation ducts, as the pilot tunnel was used for ventilation.rnLast but not least, the constructive interaction between clients, designer, site supervision and Joint Venture produced the successful conclusion to construction that had been hoped for.
机译:遵守在估算阶段已经制定的施工进度表,并进行合理的准备工作,导致线性施工现场的主要特征是精益分配和节约资源的使用。尽管同时进行了工作和内衬施工的挖掘工作,但隧道中仅雇用了50名人员.rn这种并行操作只有通过建造的桥梁才能实现,以便将其用作模板和设备承载者以及用作混凝土桩。当然,施工条件也是合适的,并且由于使用了先导隧道进行通风,因此内层衬砌可以在不被通风管道阻塞的情况下进行建造。最后但并非最不重要的是,客户之间的建设性互动,设计师,工地监督和合资企业为建设带来了圆满的希望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号