...
首页> 外文期刊>Tunnels & tunnelling international >Building new links in Budapest
【24h】

Building new links in Budapest

机译:在布达佩斯建立新的联系

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Budapest is currently embarking upon its largest transport infrastructure scheme in decades. The US$2.3bn Metro Line 4 (M4) project will play a vital role in the development of the Hungarian capital's transportation network, linking new terminals in the southwest and northeast via a number of key metro and suburban raii interchanges (figure 1). It is hoped that these new terminals, which are located on the outskirts of the city centre adjacent to commuter motorways, will ease Budapest's significant traffic congestion problems.rnLine 4 is being built in two stages by DBR Metro Project Directory, a delivery entity that was established by the City's General Assembly in 2007. The first US$1.58bn phase of the project, which began in 2006 and is scheduled for completion in 2011, runs from Kelenfoeldi station on the Buda side of the city to Pest's central Keleti railway terminus. These Phase 1 works have been split into 11 main constructionrncontracts and include 10 stations and 7.3km of twin 5.2m i.d. running tunnel. The second phase of the line, from Keleti to Bosnyak Ter (Square), will comprise a further 3.2km of twin bore tunnel and four stations.
机译:布达佩斯目前正在着手进行数十年来最大的交通基础设施计划。这个耗资23亿美元的地铁4号线(M4)项目将在匈牙利首都交通网络的发展中发挥至关重要的作用,它通过许多重要的地铁和郊区raii交汇处连接西南和东北的新航站楼(图1)。希望这些新的候机楼位于市中心郊区,靠近通勤高速公路,将缓解布达佩斯的严重交通拥堵问题。4号线由DBR地铁项目目录分两个阶段建造,该项目由纽约市大会于2007年成立。该项目的第一阶段总投资为15.8亿美元,始于2006年,计划于2011年完成,从城市布达一侧的Kelenfoeldi站一直延伸到Pest的中央Keleti铁路终点站。这些第一阶段工程已分为11个主要施工合同,包括10个车站和7.3公里的双520万内径。正在运行的隧道。线路的第二阶段,从Keleti到Bosnyak Ter(Square),将进一步包括3.2公里的双孔隧道和四个车站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号