...
首页> 外文期刊>Tunnels & tunnelling international >Ventilation and climate for a 53km trans-Andean base tunnel
【24h】

Ventilation and climate for a 53km trans-Andean base tunnel

机译:53公里跨安第斯山脉基础隧道的通风和气候

获取原文
获取原文并翻译 | 示例
           

摘要

The project Corredor Bioceanico Aconcagua (CBA) is a future rail line between Chile and Argentina with a length of about 215km. An important component of the CBA project is the 53km long base tunnel (BT), which will allow crossing the Andes most directly and with moderate inclination (Figure 1, below). The construction of the BT is divided into two different phases. First a single-tube, single-track tunnel will be constructed and operated. In a second phase, a second parallel tube will be added, so that a twin-tube, single-track rail tunnel will be available.
机译:Corredor Bioceanico Aconcagua(CBA)项目是一条智利和阿根廷之间的未来铁路线,全长约215公里。 CBA项目的重要组成部分是53公里长的基础隧道(BT),它将允许最直接且以中等倾斜度穿越安第斯山脉(下图1)。 BT的建设分为两个不同的阶段。首先,将建设和运营单管单轨隧道。在第二阶段,将添加第二条平行管,以便使用双管单轨轨道隧道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号