...
首页> 外文期刊>Tunnels & tunnelling international >Feds greenlight Honolulu wastewater tunnel project
【24h】

Feds greenlight Honolulu wastewater tunnel project

机译:美联储绿灯檀香山污水隧道项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Honolulu received federal approval to build its 3.2-mile (5km) sewage tunnel from the Kaneohe treatment plant to the Kailua wastewater facility on May 12. The cost is estimated around USD 200M. The bored tunnel will connect the Kaneohe Pre-Treatment Facility near Bayview Golf Course and end at the Kailua Regional Wastewater Treatment Plant in Aikahi. The diameter will be 10 to 13ft (3 to 4m), and the tunnel will be passing through Oneawa Hill. The project will replace a three-mile-long concrete main, 42in (1 m) in diameter, which must be replaced according to a 1995 legal settlement and consent decree concerning sewage spills.
机译:檀香山于5月12日获得联邦政府的批准,建设从Kaneohe处理厂到Kailua废水处理厂的3.2英里(5公里)污水隧道。成本估计约为2亿美元。钻孔的隧道将连接Bayview高尔夫球场附近的Kaneohe预处理设施,并终止于Aikahi的Kailua地区废水处理厂。直径将为10到13英尺(3到4m),隧道将穿过Oneawa Hill。该项目将更换直径3英里长,直径42英寸(1 m)的混凝土主体,必须根据1995年关于污水泄漏的法律解决和同意法令进行更换。

著录项

  • 来源
    《Tunnels & tunnelling international》 |2012年第junaajulaspeca期|p.5|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号