...
首页> 外文期刊>Tunnels & tunnelling international >TUNNEL CONSTRUCTION STARTS ON HONOLULU WASTEWATER PROJECT
【24h】

TUNNEL CONSTRUCTION STARTS ON HONOLULU WASTEWATER PROJECT

机译:檀香山污水项目的隧道建设开始

获取原文
获取原文并翻译 | 示例
           

摘要

Honolulu Mayor Kirk Caldwell announced the start of tunnel construction for the City and County of Honolulu's Kaneohe-Kailua Gravity Sewer Project, on February 13. The three-mile (4.8km) line running mostly under Oneawa Hills is a gravity sewer tunnel that will convey wastewater flows and store wastewater to prevent overflows and spills. Tunnelling will start at the Kailua treatment plant, approximately 62ft (18.9m) below ground, and the tunnel will be approximately 35ft (10.67m) below ground at the Kaneohe Pretreatment Facility. The contract for the Kaneohe-Kailua gravity sewer tunnel project was awarded to the joint venture group of Southland Contracting, Inc. and Mole Construction, Inc. (Southland Mole JV) and the construction management contract was awarded to local construction management firm Bowers + Kubota.
机译:檀香山市市长柯克·考德威尔(Konk Caldwell)于2月13日宣布开始为檀香山市市和县的Kaneohe-Kailua重力下水道项目修建隧道。这条长3英里(4.8公里)的线路主要在Oneawa Hills下运行,是一条重力下水道,可以输送废水流动并存储废水,以防止溢出和溢出。隧道将在距地面约62英尺(18.9m)的凯鲁瓦处理厂开始,在Kaneohe预处理设施的隧道将离地面约35英尺(10.67m)。 Kaneohe-Kailua重力污水管道项目的合同已授予Southland Contracting,Inc.和Mole Construction,Inc.(Southland Mole合资公司)的合资企业集团,而施工管理合同则授予当地的建筑管理公司Bowers + Kubota 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号