FARNWORTH TUNNEL REFURBISHMENT PROJECT

机译:费恩斯隧道翻新项目

获取原文
获取原文并翻译 | 示例
       

摘要

By working eollaboratively and with careful planning J. Murphy εt Sons, OTB and Network Rail ensured the successful completion of this complex and challenging project. While these were all proven techniques, they were combined in a way which was unique in the UK. The SCL strengthening of the Down Tunnel was the first time that Network Rail had completed such ntrusive work in possessions rather than a blockade. The design, procurement and commissioning of the bespoke 8.9m id tunnel shield was completed in only seven months. Overall the project was taken from feasibility stage to handback in under 14 months. During the construction works there were no accidents to the workforce or environmental incidents.
机译:通过协同工作和精心计划,OTB和Network Rail确保了这个复杂而富有挑战性的项目的成功完成。这些都是经过验证的技术,但它们以英国独特的方式组合在一起。下行隧道的SCL加固是Network Rail首次在拥有而不是封锁的情况下完成了如此微妙的工作。定制的8.9m内径隧道盾构的设计,采购和调试仅用了七个月就完成了。总体而言,该项目从可行性阶段转移到不到14个月的时间内。在施工过程中,没有发生人员意外或环境事故。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号