首页> 外文期刊>Tunnels & tunnelling international >FUGRO COMPLETES FEHMARNBELT GEOTECHNICAL INVESTIGATION
【24h】

FUGRO COMPLETES FEHMARNBELT GEOTECHNICAL INVESTIGATION

机译:Fugro完成Fehmarnbelt岩土工程调查

获取原文
获取原文并翻译 | 示例
       

摘要

Fugro has completed a nearshore geotechnical investigation for the FehmarTibelt Tunnel which is proposed to connect Denmark and Germany by road and rail and become the world's longest immersed tunnel.The company has been involved on the project for the past 10 years, from early site investigation work right up to the current geotechnical study. This latest phase included geotechnical site characterisation of the sub-seabed soil at both tunnel entrances and, on the Danish side, the production facility where the hollow concrete tunnel elements are being made.Fugro deployed its Skate 3 jack-up platform; a custom-designed geotechnical spread; and a specialist data-acquisition team to perform core drilling and downhole cone penetration tests. The resulting data were then analysed to determine the subsurface uncertainty to reduce the contractor's and the client's ground risk exposure by providing secured aeotechnical design input parameters.
机译:Fugro已经完成了FehMartibelt隧道的近岸岩土工程调查,该隧道旨在通过道路和铁路连接丹麦和德国,成为世界上最长的埋设隧道。该公司在过去的10年里参与了该项目,从早期的现场调查工作中涉及该项目 直到目前的岩土学研究。 这种最新阶段包括隧道入口的岩石土地的岩土现场表征,并在丹麦方面,生产设施正在制造中空混凝土隧道元件的生产设施。富口部署了它的滑板3升起平台; 定制设计的岩土工程蔓延; 和专家数据收购团队,用于执行核心钻孔和井下锥形渗透测试。 然后分析产生的数据以确定通过提供安全的AUEOTECHNICE设计输入参数来减少承包商和客户的地面风险曝光的地下不确定性。

著录项

  • 来源
    《Tunnels & tunnelling international》 |2021年第5期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 02:34:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号