...
首页> 外文期刊>Tunnels & tunnelling international >FORENSIC DELAY ANALYSIS FOR DISPUTE RESOLUTION
【24h】

FORENSIC DELAY ANALYSIS FOR DISPUTE RESOLUTION

机译:争议解决的法医延迟分析

获取原文
获取原文并翻译 | 示例
           

摘要

When applied to linear projects (such as tunnel construction), LSM can provide a more thorough and informative analysis of the cause and effect of delay events when compared to the CPM method. As with any delay analysis, the output of LSM is dependent on the quality and accuracy of the raw data available at the input stage and the experience and technical ability of the analysts. The LSM two-dimensional (2D) graphical representations ('time-chainage graphs') enable a snapshot view and valuable insight comparing, at a glance, planned vs actual performance and productivity, in time and space. Further forensic analysis can then focus on key events or periods. LSM graphs are practical, relatively easy to understand, and convey a wide range of information in a format that is easy to assimilate. These are important attributes to consider when supporting claims or opinions before a wider audience in formal dispute resolution proceedings.
机译:当应用于线性项目(如隧道施工)时,LSM可以在与CPM方法相比时对延迟事件的原因和效果提供更彻底和信息的分析。 与任何延迟分析一样,LSM的输出取决于输入阶段的原始数据的质量和准确性以及分析师的经验和技术能力。 LSM二维(2D)图形表示('时间链图')使得快照视图和有价值的见解比较,一目了然地,计划与实际性能和生产力,以及空间。 然后可以专注于关键事件或期间的进一步的法医分析。 LSM图形是实用的,相对容易理解,并以易于同化的格式传达各种信息。 这些是在正式争议解决程序中支持更广泛的受众面前支持索赔或意见时的重要属性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号