...
首页> 外文期刊>Tunnels & tunnelling international >Second Terratec TBM delivered to Rio Subterraneo a Lomas water project
【24h】

Second Terratec TBM delivered to Rio Subterraneo a Lomas water project

机译:第二台Terratec TBM向Loio Subterraneo交付了Lomas水项目

获取原文
获取原文并翻译 | 示例

摘要

The second of two new 4.66m diameter Terratec EPBMs has been delivered for a 13.5km potable water tunnel system, in Buenos Aires. Factory acceptance for the TBM, which was manufactured for the Rio Subterraneo a Lomas tunnel, took place in July. The machine will be deployed by Italian contractor CMC di Ravenna on a 13.5km-long tunnel that will carry drinking water from the newly expanded General Belgrano Water Treatment Plant, in the city of Bernal (Quilmes district), to the city of Lomas de Zamora.
机译:两个新的直径为4.66m的Terratec EPBM中的第二个已交付给位于布宜诺斯艾利斯的13.5 km饮用水隧道系统。 TBM的工厂验收是在7月进行的,该TBM是为Rio Subterraneo a Lomas隧道制造的。该机器将由意大利承包商CMC di Ravenna部署在一条13.5公里长的隧道上,该隧道将饮用水从新扩建的贝尔纳诺市将军贝尔格拉诺水处理厂从伯纳尔市(基尔姆斯区)输送到洛马斯·德·萨莫拉市。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号