...
首页> 外文期刊>Tunnel >Terratec delivers TBM for Istanbul Metro
【24h】

Terratec delivers TBM for Istanbul Metro

机译:Terratec为伊斯坦布尔地铁交付TBM

获取原文
获取原文并翻译 | 示例

摘要

Terratec has announced a new Tunnel Boring Machine delivery for Istanbul Metro in Turkey at the end of August after the successful performance of the workshop testing. The official ceremony was held on Terratec's facilities in the presence of representatives from the client, a joint venture amongst the parties of Guelermak, Kolin and Kalyon (GKKJV). The JV targets to build a rapid transit line on top of the existing Istanbul Metro system between Mecidiyekoy and Mahmutbey in the east and west respectively of the European side of the Eurasian megalopolis. The new line will be 17.5 km in length and consist of 15 stations. It is expected to be in service by 2017. The customized Tunnel Boring Machine is an EPB Shield TBM with 6.56 m diameter. The TBM has a versatile cutterhead designed to excavate Istanbul's mixed geology which includes rock formations and includes state-of-the-art features such as the VFD (Variable Frequency Drive) electric driven cutterhead, a versatile design of the cutting tools that are interchangeable with 17" roller disc cutters or the active type articulation for the shield. The TBM will be transported to Turkey and commence boring at site before end of the year.
机译:在成功进行了车间测试之后,Terratec宣布将于8月底为土耳其的伊斯坦布尔地铁交付新的隧道掘进机。正式仪式在Terratec的设施上举行,客户代表是Guelermak,Kolin和Kalyon(GKKJV)双方的合资企业。合资公司的目标是在欧亚大陆大都市欧洲一侧的东部和西部分别在Mecidiyekoy和Mahmutbey之间的现有伊斯坦布尔地铁系统之上建造一条快速运输线。新线全长17.5公里,由15个车站组成。预计将于2017年投入使用。定制的隧道掘进机是直径为6.56 m的EPB Shield TBM。 TBM具有多功能开孔刀头,设计用于挖掘伊斯坦布尔的混合地质,其中包括岩石地层,并具有最先进的功能,例如VFD(变频驱动)电动开孔刀头,该多功能刀具的设计可与17英寸圆盘铣刀或用于防护罩的主动式铰接装置。TBM将运至土耳其,并于年底前在现场开始钻孔。

著录项

  • 来源
    《Tunnel 》 |2014年第7期| 5-5| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号