首页> 外文期刊>Tunnels & tunnelling international >First TBM breakthrough in Sydney's central business district
【24h】

First TBM breakthrough in Sydney's central business district

机译:悉尼中央商务区的第一个TBM突破

获取原文
获取原文并翻译 | 示例
           

摘要

The first TBM has broken through into the Pitt Street metro station in Sydney's central business district (CBD). TBM 'Nancy', a double shield hard rock gripper machine manufactured by Herrenknecht has tunnelled 6km through sandstone and shale since launching from Marrickville in October. TBM 'Mum Shirl', excavating the parallel tunnel, is a few hundred metres behind. The TBM will undergo maintenance before being re-launched towards by contractor John Holland CPB Ghella JV towards the Martin Place station then on to Barangaroo.
机译:第一个TBM闯入了悉尼中央商务区(CBD)的皮特街地铁站。自10月从马里克维尔(Marrickville)发射以来,海瑞克(Herenknecht)制造的TBM'Nancy'是一款双盾硬岩抓爪机,已经穿过砂岩和页岩延伸了6公里。掘进平行隧道的TBM'Mum Shirl'落后几百米。 TBM将进行维护,然后再由承包商John Holland CPB Ghella合资公司向马丁广场站发射,然后到达Barangaroo。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号