首页> 外文期刊>Tunnels & tunnelling international >DRILLER MIKE BREAKS THROUGH ON BELLWOOD TUNNEL
【24h】

DRILLER MIKE BREAKS THROUGH ON BELLWOOD TUNNEL

机译:戴勒·迈克(Driller Mike)穿越贝尔伍德隧道(Bellwood Tunnel)

获取原文
获取原文并翻译 | 示例
       

摘要

USA - The TBM excavating a new water supply tunnel in Atlanta, Georgia has broken through. The 3.8m Robbins hard rock machine named Driller Mike after local rapper and activist Killer Mike finished excavation of the 8km tunnel on 3 October.The tunnel is only the third large construction project in the USA to use the Construction Manager at Risk (CMAR)structure. The PC Construction/HJ Russell JV carried out this role. The designer was JP2, a JV of Stantec, PRAD Group, and River 2 Tap. TBM operation was subcontracted to the Atkinson/Technique JV.The TBM launched from the Bellwood Quarry site in October 2016 despite challenging working conditions including summer temperatures hitting 43 degrees Celsius and 100 percent humidity.
机译:美国-在佐治亚州亚特兰大开凿的新供水隧道的隧道掘进机已经突破。在当地说唱歌手和激进主义者杀手迈克(Killer Mike)于10月3日完成了380万米长的罗宾斯硬岩凿岩机的钻探工作后,他于10月3日完成了开挖工作。 CMAR) r n结构。 PC Construction / HJ Russell合资企业担当了这个角色。设计师是JP2,这是Stantec,PRAD Group和River 2 Tap的合资企业。 TBM的运营已分包给Atkinson / Technique合资公司。 r n尽管工作条件艰苦,包括夏季温度达到摄氏43度和100%湿度,TBM还是于2016年10月从Bellwood Quarry基地发射。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号