Key aspects of a DN4000 steel pipe jacking project in China: A case study of a water pipeline in the Shanghai Huangpu River

机译:DN4000钢管顶管项目的关键方面:以上海黄浦江输水管道为例

获取原文
获取原文并翻译 | 示例
       

摘要

Pipe Jacking is one of the most popular method to construct new pipelines below the ground surface in the area of oil & gas, water supply, sewage, communication and electricity pipelines, and pipe-roof projects. The common jacked pipes are concrete pipes, steel pipes, glass Fiber Reinforced plastic Mortar Pipes (FRMP), cast ductile iron pipes and clay pipes. The key technologies involved includes but not limited to: selection of the jacking machine, jacking force prediction and reduction, trajectory deviation control and corrosion protection. Moreover, the key technologies may changes from one jacking project to another one, as the geological conditions and the size of the jacking projects changes. These key aspects are crucial importance especially for the large diameter pipe jacking, because out of control of theses aspects will remarkably increase of the failure risks. In this paper, these key aspects were introduced and discussed based on the largest diameter steel pipe jacking project, called C3 pipe jacking project. This projects involved nine sections of a DN4000 mm and totally 5221 m jacking length in soft soil strata. The largest single jacking length between two shafts is 970 m. An earth-pressure-balance pipe jacking machine (EPB) with a large spoke-type cutter face was employed to excavate the soil. A highly viscous bentonite slurry mixed with polymer was used to reduce the friction resistance. Close control of the pipe welding and use of corrosion protection technology has ensured the efficiency and quality of the project.
机译:顶管法是在油气,供水,排污,通信和电力管道以及屋顶工程领域中在地下以下建造新管道的最受欢迎的方法之一。常见的顶管是混凝土管,钢管,玻璃纤维塑料砂浆管(FRMP),球墨铸铁管和粘土管。所涉及的关键技术包括但不限于:顶升机的选择,顶升力的预测和减小,轨迹偏差控制和腐蚀防护。而且,随着地质条件和顶升工程规模的变化,关键技术可能会从一个顶升工程变为另一个顶升工程。这些关键方面尤其对于大直径顶管至关重要,因为这些方面的失控将大大增加故障风险。本文基于最大直径的钢管顶管工程C3顶管工程对这些关键方面进行了介绍和讨论。该项目涉及软土层中的DN4000 mm的9个断面和总共5221 m的顶进长度。两个竖井之间最大的单顶升长度为970 m。使用具有大轮辐型切割面的土压平衡顶管机(EPB)来开挖土壤。高粘度的膨润土浆料与聚合物混合用于降低摩擦阻力。管道焊接的严格控制和腐蚀防护技术的使用确保了项目的效率和质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号