首页> 外文期刊>Tunnelling and underground space technology >Visibility graph analysis on time series of shield tunneling parameters based on complex network theory
【24h】

Visibility graph analysis on time series of shield tunneling parameters based on complex network theory

机译:基于复杂网络理论的盾构隧道参数时间序列可视化图分析

获取原文
获取原文并翻译 | 示例
           

摘要

Shield tunneling operation affects project scheduling, cost estimation, and safety risk during metro construction. Given the importance of this process, tunnel engineers should understand the complexities of shield tunneling parameters. This study addresses the characteristics of shield tunneling parameters by introducing a visibility graph model implemented in a complex network of shield tunneling in metro construction. Time series data are collected for the analysis of six parameters generated in each segment ring tunneling cycle. These parameters are total thrust, torque, penetration rate, rotation rate, advance speed, and working chamber pressure. Bridging time series and the complex network with visibility graph algorithm indicates that all degree distributions of the construct networks follow the power law, establishing the scale-free time series of the parameters. Small-world features and hierarchical structures also indicate that the fluctuation and variance of the parameters are attracted, limited, or affected by a previous shield operation of segment rings. In addition, findings reveal turning points in the parameters' time series with vital node identification based on complex network analysis. Implications relevant for shield operators and managers are proposed to improve shield tunneling performance, efficiency, and safety.
机译:盾构隧道运营会影响地铁施工期间的项目进度,成本估算和安全风险。鉴于此过程的重要性,隧道工程师应了解盾构隧道参数的复杂性。通过引入在地铁施工中复杂的盾构隧道网络中实现的可见性图模型,本研究解决了盾构隧道参数的特征。收集时间序列数据以分析每个分段环隧穿循环中生成的六个参数。这些参数是总推力,扭矩,穿透率,转速,前进速度和工作室压力。桥接时间序列和具有可见性图算法的复杂网络表明,构造网络的所有度分布都遵循幂律,从而建立了参数的无标度时间序列。小世界特征和层次结构还表明,参数的波动和方差被分段环的先前屏蔽操作所吸引,限制或影响。此外,研究结果还揭示了参数的时间序列中的转折点,并基于复杂网络分析确定了重要节点。为了提高盾构的掘进性能,效率和安全性,提出了与盾构运营商和管理者有关的建议。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2019年第7期|10-24|共15页
  • 作者单位

    Huazhong Univ Sci & Technol, Dept Construct Management, Sch Civil Engn & Mech, Wuhan, Hubei, Peoples R China|Hubei Engn Res Ctr Virtual Safe & Automated Const, Wuhan, Hubei, Peoples R China|Univ Maryland, Dept Civil & Environm Engn, College Pk, MD 20742 USA;

    Huazhong Univ Sci & Technol, Dept Construct Management, Sch Civil Engn & Mech, Wuhan, Hubei, Peoples R China|Hubei Engn Res Ctr Virtual Safe & Automated Const, Wuhan, Hubei, Peoples R China;

    Huazhong Univ Sci & Technol, Dept Construct Management, Sch Civil Engn & Mech, Wuhan, Hubei, Peoples R China|Hubei Engn Res Ctr Virtual Safe & Automated Const, Wuhan, Hubei, Peoples R China;

    Univ Maryland, Dept Civil & Environm Engn, College Pk, MD 20742 USA|Polish Acad Sci, Inst Theoret & Appl Informat, Gliwice, Poland|Chaoyang Univ Technol, Taichung, Taiwan;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Shield tunneling; Parameter; Complex network; Visibility graph; Time series; Metro construction;

    机译:盾构;参数;复杂网络;能见度图;时间序列;地铁施工;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号