首页> 外文期刊>Trenchless Technology >Increasing Sewer Capacity with CCFRPM Pipe in Colorado
【24h】

Increasing Sewer Capacity with CCFRPM Pipe in Colorado

机译:科罗拉多州CCFRPM管增加下水道容量

获取原文
获取原文并翻译 | 示例
           

摘要

Denver and Aurora are the principal cities of the Denver Metropolitan Area in Colorado. Aurora, with a growing population of more than 300,000 residents, is home to a vibrant business environment. It includes major industries such as aerospace, military, renewable energy, high-tech, biotechnology and health care, distribution and manufacturing. The majority of the wastewater generated in Aurora is conveyed through the Tollgate Creek Interceptor to the Metro Wastewater Reclamation District's Robert W. Hite Wastewater Treatment Facility. The interceptor begins in the southern portion of the city and runs north along the banks of the Tollgate Creek to the treatment plant. Installed in the 1980s, the Tollgate Creek Interceptor consists of reinforced concrete pipe and varies in diameter from 30 to 42 in. Based on future planning, the City of Aurora identified the need for additional capacity in the Toll-gate system. Another consideration was the poor condition of the existing interceptor. Pipe samples from the existing Tollgate Interceptor line indicated significant deterioration.
机译:丹佛和奥罗拉是科罗拉多州丹佛都会区的主要城市。奥罗拉(Aurora)人口不断增长,超过30万,是充满活力的商业环境的所在地。它包括航空航天,军事,可再生能源,高科技,生物技术和医疗保健,分销和制造等主要行业。奥罗拉(Aurora)产生的大部分废水都通过Tollgate Creek拦截器输送到地铁废水回收区的Robert W. Hite废水处理设施。拦截器始于城市的南部,沿Tollgate Creek的河岸向北延伸至处理厂。 Tollgate Creek拦截器安装在1980年代,由钢筋混凝土管组成,直径从30到42 in不等。根据未来的计划,Aurora市确定了Toll-gate系统需要额外的容量。另一个考虑因素是现有拦截器的状况不佳。现有Tollgate拦截器生产线的管道样品显示严重恶化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号