首页> 外文期刊>Transportation Science >Maintenance Routing for Train Units: The Transition Model
【24h】

Maintenance Routing for Train Units: The Transition Model

机译:火车单元的维护路线:过渡模型

获取原文
获取原文并翻译 | 示例
       

摘要

Train units need regular preventive maintenance. Given the train units that require maintenance in the forthcoming one to three days, the rolling stock schedule must be adjusted so that these urgent units reach the maintenance facility in time. Maroti and Kroon (2004) propose a model that requires a large amount of input data. In this paper we describe a less involved multicommodity flow type model for this maintenance routing problem. We study the complexity of the problem. It turns out that the feasibility problem for a single urgent train unit is polynomially solvable but the optimization version is NP-hard. Finally, we report our computational experiments on practical instances of NS Reizigers, the main Dutch operator of passenger trains.
机译:火车单位需要定期的预防性维护。考虑到需要在未来一到三天内进行维护的火车单元,必须调整机车时刻表,以便这些紧急单元能够及时到达维护设施。 Maroti和Kroon(2004)提出了一个需要大量输入数据的模型。在本文中,我们针对此维护路由问题描述了一种较少参与的多商品流类型模型。我们研究问题的复杂性。事实证明,单个紧急列车单元的可行性问题可以多项式求解,但优化版本为NP-hard。最后,我们报告了我们在荷兰主要旅客列车运营商NS Reizigers的实际实例上进行的计算实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号