...
首页> 外文期刊>Transportation research >Modeling the first train timetabling problem with minimal missed trains and synchronization time differences in subway networks
【24h】

Modeling the first train timetabling problem with minimal missed trains and synchronization time differences in subway networks

机译:用最小的错过火车和地铁网络中的同步时间差异对第一个火车时间表问题进行建模

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Urban railway transportation organization is a systematic activity that is usually composed of several stages, including network design, line planning, timetabling, rolling stock and staffing. In this paper, we study the optimization of first train timetables for an urban railway network that focuses on designing convenient and smooth timetables for morning passengers. We propose a mixed integer programming (MIP) model for minimizing train arrival time differences and the number of missed trains, i.e., the number of trains without transfers within a reasonable time at interchange stations as an alternative to minimize passenger transfer waiting times. This is interesting from the operator's point of view, and we show that both criteria are equivalent. Starting from an intuitive model for the first train transfer problem, we then linearize the non-linear constraints by utilizing problem specific knowledge. In addition, a local search algorithm is developed to solve the timetabling problem. Through computational experiments involving the Beijing subway system, we demonstrate the computational efficiency of the exact model and the heuristic approach. Finally, three practical suggestions are proposed for the operation and management of the urban railway transit system. (C) 2016 Elsevier Ltd. All rights reserved.
机译:城市铁路运输组织是一项系统活动,通常由几个阶段组成,包括网络设计,线路规划,时间表,机车车辆和人员编制。在本文中,我们研究了针对城市铁路网络的首列火车时刻表的优化,其重点是为早上的乘客设计方便,平稳的时刻表。我们提出了一种混合整数规划(MIP)模型,以最大程度地减少列车到站时间的差异和错失列车的数量,即在合理的时间内在换乘站不进行换乘的列车数量,以最大限度地减少乘客的换乘等待时间。从操作员的角度来看,这很有趣,并且我们证明这两个标准是等效的。从第一个火车转乘问题的直观模型开始,然后我们通过利用问题特定的知识来线性化非线性约束。另外,开发了本地搜索算法来解决时间表问题。通过涉及北京地铁系统的计算实验,我们证明了精确模型的计算效率和启发式方法。最后,针对城市轨道交通系统的运行和管理提出了三个实践建议。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

  • 来源
    《Transportation research》 |2016年第11期|17-36|共20页
  • 作者单位

    Beijing Jiaotong Univ, MOE Key Lab Urban Transportat Complex Syst Theory, Beijing 100044, Peoples R China|Natl Univ Singapore, Ctr Maritime Studies, Singapore 117576, Singapore;

    Beijing Jiaotong Univ, MOE Key Lab Urban Transportat Complex Syst Theory, Beijing 100044, Peoples R China;

    Beijing Jiaotong Univ, MOE Key Lab Urban Transportat Complex Syst Theory, Beijing 100044, Peoples R China;

    Univ Paris Saclay, Cent Supelec, Lab Genie Ind, Chatenay Malabry, France|Inst Rech Technol SystemX, Palaiseau, France;

    Univ Vienna, Dept Stat & Operat Res, A-1010 Vienna, Austria;

    Austrian Inst Technol, Mobil Dept, A-1210 Vienna, Austria;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    First train timetabling; MIP model; Linearization; Heuristic; Case study;

    机译:首次列车时刻表;MIP模型;线性化;启发式;案例研究;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号