...
首页> 外文期刊>Transportation Research >Bulk ship fleet renewal and deployment under uncertainty: A multi-stage stochastic programming approach
【24h】

Bulk ship fleet renewal and deployment under uncertainty: A multi-stage stochastic programming approach

机译:不确定条件下的散装船队更新和部署:多阶段随机规划方法

获取原文
获取原文并翻译 | 示例
           

摘要

Faced with simultaneous demand and charter cost uncertainty, an industrial shipping company must determine a suitable fleet size, mix, and deployment strategy to satisfy demand. It acquires vessels by time chartering and voyage chartering. Time chartered vessels are acquired for different durations, a decision made before stochastic parameters are known. Voyage charters are procured for a single voyage after uncertain parameters are realized. We introduce the first multi-stage stochastic programming model for the bulk ship fleet renewal problem and solve it in a rolling horizon fashion. Computational results indicate that our approach outperforms traditional methods relying on expected value forecasts. (C) 2016 Elsevier Ltd. All rights reserved.
机译:面对同时的需求和包机成本的不确定性,一家工业运输公司必须确定合适的船队规模,组合和部署策略,以满足需求。它通过定期租船和航行租船来获取船只。租用定期租船的时间不同,这是在知道随机参数之前做出的决定。在实现不确定的参数后,为单次航行采购航行租船合同。我们介绍了散装船队更新问题的第一个多阶段随机规划模型,并以滚动方式解决。计算结果表明,我们的方法优于依靠预期值预测的传统方法。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号