首页> 外文期刊>Transportation Research >From bus to tramway: Is there an economic impact of substituting a rapid mass transit system? An empirical investigation accounting for anticipation effect
【24h】

From bus to tramway: Is there an economic impact of substituting a rapid mass transit system? An empirical investigation accounting for anticipation effect

机译:从公共汽车到有轨电车:替代快速的公交系统会对经济产生影响吗?考虑预期效应的实证研究

获取原文
获取原文并翻译 | 示例
           

摘要

Hedonic pricing models and price equations have been extensively used to retrieve the implicit prices of urban externalities through real estate markets. Many applications have been devoted to investigating the impact of new mass transit systems, such as rail infrastructures. However, the implementation of such infrastructures usually takes some time and markets can react with an anticipation effect that can vary according to the different development phases. Moreover, the impact may be different if it acts as a substitute to existing rapid transit services. This paper focuses on the impact of substituting bus rapid transit (BRT) for light rail transit (LRT) services, taking into account temporal and spatial decomposition of the effect of new urban infrastructures using a spatial difference-in-differences (SDID) estimator based on a repeated sales approach. An empirical investigation is conducted for the case of the implementation of the tramway in Dijon (France) between 2008 and 2012 using apartment transactions occurring between 2001 and 2014. The results indicate that the impact of substituting LRT to BRT is partly anticipated at the construction phase, while the cumulative impact returns a complex pattern where the positive effect is mainly concentrated around stations located in the center of the city.
机译:享乐定价模型和价格方程已被广泛用于通过房地产市场获取城市外部性的隐性价格。许多应用已专门用于调查新型公共交通系统(如铁路基础设施)的影响。但是,此类基础架构的实施通常需要一些时间,并且市场可能会根据不同的开发阶段而有所不同的预期效果做出反应。此外,如果替代现有的快速运输服务,其影响可能会有所不同。本文着眼于使用基于空间差异(SDID)估计器的新城市基础设施的影响在时间和空间上的分解,着眼于将公交快速公交(BRT)替代轻轨运输(LRT)服务的影响重复销售的方式。对第戎(法国)在2008年至2012年之间使用2001年至2014年之间发生的公寓交易的电车轨道实施情况进行了一项实证研究。结果表明,在施工阶段,部分有望将轻轨替换为BRT的影响,而累积影响会返回一个复杂的模式,其中积极影响主要集中在位于城市中心的车站周围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号