...
首页> 外文期刊>Transportation Research Record >Adventures in Building Another Washington Monument
【24h】

Adventures in Building Another Washington Monument

机译:建造另一个华盛顿纪念碑的历险记

获取原文
获取原文并翻译 | 示例

摘要

In December 2001, the Maryland State Highway Administration (SHA) opened a single bid for the substructure and superstructure contract to replace the Woodrow Wilson Memorial Bridge, the crossing of the Potomac River for I-95 and I-495 (Capital Beltway) traffic. This contract was part of the larger Woodrow Wilson Bridge project, a $2.5 billion project to build the new Potomac River crossing and to reconstruct the four interchanges in its vicinity. The contract's estimate was a record for SHA at $487 million. The single bid was for a budget-wrecking $860 million and was rejected. The design team regrouped and focused its efforts on innovative means for bringing the project back on budget Maryland SHA convened an independent review committee (IRC). Composed of industry experts, the IRC advised the design team on making the contract less expensive and more attractive to contractors to increase competition and reduce costs. Ultimately, the work was readvertised as three separate contracts. The outcome of redesigning and readvertising was to reduce the total bid amount for the work by $362 million. Several lessons were learned in handling megaprojects: reach out to the construction industry early and often to rouse and maintain interest in the project; make terms of the contracts as contractor friendly as reasonable; and, when sizing the contract, ensure that it is manageable and that it balances competition and contract interface risk.
机译:2001年12月,马里兰州公路管理局(SHA)公开招标了一项子结构和上层建筑合同,以取代伍德罗·威尔逊纪念桥(Woodrow Wilson Memorial Bridge),波托马克河穿越I-95和I-495(首都环城公路)的交通。该合同是更大的伍德罗·威尔逊大桥项目的一部分,该项目耗资25亿美元,用于建造新的波托马克河过境点并重建其附近的四个立交桥。该合同的估算是SHA创纪录的4.87亿美元。唯一的一笔竞标是预算高达8.6亿美元的竞标,但遭到拒绝。设计团队进行了重组,并将工作重点放在了使该项目恢复预算的创新手段上。马里兰SHA召集了一个独立审查委员会(IRC)。 IRC由行业专家组成,为设计团队提供建议,以使合同更便宜,对承包商更具吸引力,从而增加竞争并降低成本。最终,该作品被重新宣传为三个单独的合同。重新设计和重新广告化的结果是将作品的总投标金额减少了3.62亿美元。在处理大型项目方面吸取了一些教训:尽早接触建筑行业,并经常引起和保持对该项目的兴趣;使合同中的条款对承包商友好并且,在确定合同大小时,请确保它是可管理的,并且可以平衡竞争和合同接口风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号