首页> 外文期刊>铁道総研報告 >Vertical Loading Test of Hybrid Pile Consisting of Steel Pipe and Soil Cement
【24h】

Vertical Loading Test of Hybrid Pile Consisting of Steel Pipe and Soil Cement

机译:钢管与水泥土混合桩的竖向荷载试验

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The hybrid pile consisting of steel pipe and soil cement was developed to (1)reduce excavated soil, (2)noise and vibration during pile installation, (3)ensure high seismic performance and bearing capacity, and (4)implement stable execution control and maintain constant pile quality. There are two execution methods. One is to install a steel pipe during the construction of a soil cement column. The other is to install a steel pipe after the construction. This paper discusses a vertical loading test of the hybrid pile to install a steel pipe after its construction.
机译:开发了由钢管和土壤水泥组成的混合桩,以(1)减少挖出的土壤,(2)桩安装过程中的噪声和振动,(3)确保高抗震性能和承载力,(4)实施稳定的执行控制和保持恒定的桩质量。有两种执行方法。一种是在土壤水泥柱的建造过程中安装钢管。另一种是在施工后安装钢管。本文讨论了混合桩在钢管施工后的垂直荷载试验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号