...
【24h】

ONE A DECADE

机译:十分之一

获取原文
获取原文并翻译 | 示例
           

摘要

The line-up will encompass double-deckers and artics along with single-deckers, with the first battery-electric models scheduled to appear on this side of the Channel late in the first quarter of 2022, or early in the second quarter. They will be fitted with a 300kW electric motor driving through a two-speed gearbox and powered by either eight or ten lithium-ion batteries. The manufacturer was unable to give details of the range between recharges at the time of writing. The entire electric drivetrain has been conceived using Scania technology. The batteries have been developed in cooperation with Northvolt, which has Scania as a major investor, and Scania is building a €100m (£87m) battery assembly plant next door to its headquarters and factory in Sweden. Northvolt will make the cells and Scania will put together the battery modules and packs. A battery research and development laboratory will form part of the operation as Scania looks to electrify its truck as well as its bus portfolio.
机译:这些阵容将包括双层和艺术以及单层,其中第一批电池电动机型号在2022年的第一季度或在第二季度早期出现在频道的这一侧。它们将配备300kW电动机,通过双速齿轮箱驱动,由八个或十个锂离子电池供电。制造商无法在写作时提供充电之间的范围的细节。使用Scania技术构思了整个电动传动系统。电池已与北欧合作开发,斯堪尼亚作为主要投资者,斯堪尼亚正在为瑞典的总部和工厂建造100万欧元(8700万英镑)的电池组装工厂。北堡将使电池和斯堪尼亚将电池模块和包装放在一起。电池研发实验室将成为斯堪尼亚的一部分,因为斯堪尼亚希望将其卡车和总线投资组合电气。

著录项

  • 来源
    《Transport engineer》 |2021年第7期|17-17|共1页
  • 作者

    Steve Banner;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号