...
首页> 外文期刊>Transit Australia >New MetroRail Update
【24h】

New MetroRail Update

机译:新的MetroRail更新

获取原文
获取原文并翻译 | 示例

摘要

Work is steadily progressing on the early stages of the Southern Suburbs Railway (SSR) from Perth to Mandurah and work also is nearing completion on the Northern Suburbs Railway (NSR) extension to Clarkson under Perth's New MetroRail Project (NMR). This report updates progress; see previous article and map in TA 4/04 and Transit Newsfile in TA 5/04 and 7/04. The NMR project is responsible for the construction of 15 new stations, extensions or upgrades to eight other stations, the construction of 20 bridges and structures, 81.5km of track and associated infrastructure, and the manufacture of 93 new electric multiple unit railcars.
机译:从珀斯到曼杜拉的南郊铁路(SSR)的早期工作正在稳步进行,在珀斯的新地铁轨道项目(NMR)下,北郊铁路(NSR)扩建至克拉克森的工作也已接近完成。该报告更新进度;请参阅上一篇文章和TA 4/04中的映射,以及TA 5/04和7/04中的Transit Newsfile。 NMR项目负责建设15个新站,扩建或升级其他8个站,建造20座桥梁和结构,81.5公里的轨道及相关基础设施,以及制造93辆新的电动多单元轨道车。

著录项

  • 来源
    《Transit Australia 》 |2004年第9期| p.272-273| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号