...
首页> 外文期刊>Transit Australia >Downer EDI Limited and Waratah Trains
【24h】

Downer EDI Limited and Waratah Trains

机译:Downer EDI Limited和Waratah列车

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

On 27 January Downer EDI Limited issued an official statement to the Australian Stock Exchange regarding the NSW Waratah suburban trains and its financial position. This indicated that there had been further delays in presenting the first Waratah train set to RailCorp for Practical Completion; delays in production of subsequent trains as a result of asbestos in the Cardiff manufacturing facility; and changes to the manufacturing production schedule and project costs,The Chief Executive Officer of Downer, Grant Fenn, said Downer remained fully committed to the Waratah train project.
机译:1月27日,Downer EDI Limited向澳大利亚证券交易所发布了有关新南威尔士州Waratah郊区火车及其财务状况的正式声明。这表明在向RailCorp交付第一套Waratah列车以实际完成方面还有进一步的延误;卡迪夫制造厂的石棉导致后续火车生产的延迟;唐纳行政总裁格兰特·芬恩(Grant Fenn)表示,唐纳仍完全致力于Waratah火车项目。

著录项

  • 来源
    《Transit Australia》 |2011年第4期|p.101-102|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号