...
首页> 外文期刊>Transit Australia >Renewing Brisbane's Ferry Terminals
【24h】

Renewing Brisbane's Ferry Terminals

机译:更新布里斯班的轮渡码头

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

TransLink is currently rebuilding some of Brisbane's ferry terminals. The proposal was well underway in 2014 with the reconstruction of the Bulimba ferry terminal, involving the use of a large pile driver, but now the task is focussed on the Regatta and Sydney Street terminals. Concurrently, work is underway on a brand new terminal and stop at Milton, where in late December 2014 work was advanced but still some time from completion. Mercifully, at Bulimba the historic BCC era timber cupola domed ferry waiting shed was retained. On 15 December 2014, Hawthorne terminal closed for a lengthy period for reconstruction work. The level of disruption is significant. For instance, with the Sydney Street terminal closure taking effect on 5 January, a large part of New Farm will lose both CityHopper and CityCat services for an indeterminate period of time. The public notices are unclear as to when services will resume, stating only that this will occur sometime in mid 2015, without even a specified month.
机译:TransLink目前正在重建布里斯班的部分轮渡码头。 2014年,随着Bulimba轮渡码头的重建(包括使用大型打桩机)的使用,该提案进展顺利,但现在的任务集中在Regatta和Sydney Street码头。同时,一个新的航站楼正在进行工程,停在米尔顿,在2014年12月下旬,工程虽然进行了,但距离竣工还有一段时间。幸运的是,在Bulimba,保留了历史悠久的BCC时代的木穹顶圆顶渡轮等候棚。 2014年12月15日,霍桑码头关闭了一个漫长的时期,用于重建工作。中断级别很重要。例如,随着悉尼街码头关闭于1月5日生效,新农场的很大一部分将在不确定的时间内失去CityHopper和CityCat服务。关于何时恢复服务的公开通知尚不清楚,仅指出这将在2015年中的某个时间发生,甚至没有指定的月份。

著录项

  • 来源
    《Transit Australia》 |2015年第3期|77-78|共2页
  • 作者

    Rod Milne;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号