THE CHALLENGES OF MAJOR TANK COATING REFURBISHMENT PROJECTS FOR ON-STATION FLOATING ASSETS

机译:车站浮动资产主要坦克涂层翻新项目的挑战

获取原文
获取原文并翻译 | 示例

摘要

The objective of this paper is to acknowledge that major tank coating refurbishment projects to FPSO's and FSLTs are likely to be required during the life of these assets. It highlights the key challenges of achieving these major coating projects in an offshore environment, whilst the assets remain operational and in-production. As these floating assets age the original coatings applied to protect the internal (and external) hull, deteriorate. In an industry with a reluctance for extensive dry-dockings, there is an expectation that any coating refurbishment campaigns can be achieved safely and efficiently whilst the assets remain on-station and in-production, in preference to costly steel renewal's which may be required at a future date if coatings are not maintained in good condition. With often complex, congested and hazardous topsides processing equipment and pipework directly above the hull tanks, there's a need for systems, procedures, and specialist equipment to ensure the safety of the personnel entering confined spaces for extended periods. There's also a need to plan and engineer the works appropriately, using best practice and emergent technologies to improve safety, reduce bedding unpads and to ensure the success of the coating campaign. This paper explores the challenges of major coating projects by discussing the importance of planning and preparation, the need to create a safe working environment within the confined space worksites, the role surface preparation plays in the success of coating projects, and finally the application of coatings and the challenges this operation can present. The key considerations are siunmarised in 10 specific conclusions as guidance to promote successful project outcomes.
机译:本文的目的是承认,在这些资产的生命期间,可能需要对FPSO和FSLTS的主要坦克涂层翻新项目进行翻新项目。它突出了在海上环境中实现这些主要涂层项目的关键挑战,而资产仍然是运作和生产的。由于这些浮动资产增量,适用于保护内部(和外部)船体的原始涂层恶化。在一个不愿意进行广泛的干耦合的行业中,期望任何涂层翻新活动都可以安全有效地实现,而资产仍然是在车站和生产中,优先于昂贵的钢铁更新,这可能需要在昂贵的钢铁更新如果涂层不保持良好状态,则未来日期。由于经常复杂,拥挤和危险的覆盖层加工设备和管道直接在船体罐上方,需要系统,程序和专业设备,以确保人员在延长期间进入限制空间的人员的安全性。还需要使用最佳实践和紧急技术来适当计划和工程,以改善安全,减少床上用品免疫板,并确保涂层运动的成功。本文通过讨论规划和准备的重要性,探讨了主要涂层项目的挑战,在狭窄的空间工程内创建安全工作环境,角色表面准备在涂层项目的成功中发挥作用,最后应用涂料并且这个操作可能存在的挑战。在10个具体结论中,关键考虑因素是促进成功项目成果的指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号