首页> 外文期刊>Transactions of the American nuclear society >Site Selection and Environmental Requirements for Commercial Nuclear Power Plants Under 10 CFR 52
【24h】

Site Selection and Environmental Requirements for Commercial Nuclear Power Plants Under 10 CFR 52

机译:10 CFR 52下商业核电站的选址和环境要求

获取原文
获取原文并翻译 | 示例
           

摘要

In order for a commercial nuclear power plant to operate in the United States, it has to obtain a license from the U.S. Nuclear Regulatory Commission (NRC). In the past, nuclear power plants were licensed under a two-step licensing process. This process required separate approvals for both the construction permit and the operating license. In 1989, the NRC established new alternatives for nuclear plant licensing under 10 CFR Part 52, which describes a combined operating licensing process (COL), an early site permit process (ESP), and a standard plant design certification process (DC). An application for a combined license may incorporate by reference DC, an ESP, both, or neither. This approach allows early resolution of safety and environmental issues. The issues resolved by the design certification rulemaking process and during the early site permit hearing process are not reconsidered during the combined license review. These processes are discussed in Figure 1, which shows the relationship between the three processes.
机译:为了使商业性核电厂在美国运行,它必须获得美国核监管委员会(NRC)的许可。过去,核电厂是按照两步许可程序进行许可的。该过程需要获得施工许可证和运营许可证的单独批准。 1989年,NRC根据10 CFR第52部分建立了核电厂许可的新替代方案,该替代方案描述了合并的运营许可程序(COL),早期现场许可程序(ESP)和标准工厂设计认证程序(DC)。组合许可证的申请可以通过引用DC或ESP两者结合,或两者都不结合。这种方法可以及早解决安全和环境问题。在合并许可证审查期间,不会重新考虑由设计认证规则制定流程解决的问题以及在早期现场许可听证过程中解决的问题。这些过程在图1中进行了讨论,图1显示了这三个过程之间的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号