Potential Plutonium Utilisation in UK PWRs Using MOX and IMF; Sizewell 'B'

机译:使用MOX和IMF在英国压水堆中潜在的P利用; Sizewell'B'

获取原文
获取原文并翻译 | 示例

摘要

In April 2005, the UK Nuclear Decommissioning Authority (NDA) took ownership of most of the civil nuclear liabilities and assets in the UK. These include the separated civil plutonium stocks, which are expected to rise to over 100 tonnes by the end of reprocessing in the UK. Nexia Solutions has a contract with the NDA to develop and carry out a research project which will result in a recommendation on the technical feasibility of a number of disposition options, focusing on reactor re-use and immobilization of plutonium as a waste for disposal. In the case of the re-use options and following a preliminary down selection process, two different reactor types are initially being considered; Sizewell 'B', a Westinghouse four loop design and the only existing PWR in the UK and the Westinghouse "Generation III+" AP1000 PWR, one of the reactor systems to be potentially considered for new nuclear build in the UK. This paper describes work carried out for Sizewell 'B' - one half of the reactor re-use work completed to date on steady state core design, safety analyses and fuel performance assessments for UK PWRs. A second paper reporting similar analyses for an AP1000~a has also been submitted to this conference. The two papers complement each other and provide a detailed insight into the reactor re-use project and the recommendations for the management of UK separated Pu in the future if a reactor option were to be chosen.
机译:2005年4月,英国核退役管理局(NDA)拥有了英国大部分民用核债务和资产的所有权。其中包括分离的民用stock存量,到英国再加工结束时,预计civil存量将超过100吨。 Nexia Solutions与NDA签订了开发和实施一项研究项目的合同,该研究项目将就多种处置方案的技术可行性提出建议,重点在于反应堆的再利用和im固定化以作为处置废物。对于重复使用的方案,并在初步的向下选择过程之后,最初考虑的是两种不同的反应堆类型。 Sizewell'B'是西屋公司的四回路设计,并且是英国唯一的现有压水堆,而西屋公司的“ Generation III +” AP1000 PWR是英国可能考虑用于新建核电站的反应堆系统之一。本文介绍了为Sizewell'B'进行的工作-迄今为止完成的反应堆再利用工作的一半,涉及英国压水堆的稳态堆芯设计,安全分析和燃料性能评估。报告了对AP1000〜a进行类似分析的第二篇论文也已提交给本次会议。这两篇论文相辅相成,提供了对反应堆再利用项目的详细见解,以及如果要选择反应堆选件,则可为英国分离Pu的未来管理提供建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号