首页> 外文期刊>Transactions of the American nuclear society >Risk-Informed Decision Making: Application in Nuclear Power Plant Design & Operation
【24h】

Risk-Informed Decision Making: Application in Nuclear Power Plant Design & Operation

机译:风险知情决策:在核电站设计与运行中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Generally, a risk-informed analysis will involve a relatively broad spectrum of disciplines and realistic engineering analysis as required in NRC guidance. Traditionally, engineering analysis in commercial nuclear power applications has lacked detailed uncertainty analysis and quantification. Instead, "worst case" or credible extremes are evaluated separately. Where uncertainty has been evaluated , it is not clearly related to risk or scenario importance. Quantification of risk and uncertainty is a basic need in a risk-informed regulatory paradigm.
机译:通常,根据NRC指南的要求,风险分析将涉及相对广泛的学科和现实工程分析。传统上,商业核电应用中的工程分析缺乏详细的不确定性分析和量化。而是分别评估“最坏情况”或可信的极端情况。在评估不确定性的地方,它与风险或方案重要性没有明显关系。风险和不确定性的量化是基于风险的监管范式的基本需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号