首页> 外文期刊>Transactions of the American nuclear society >Godiva Ⅳ Startup at National Criticality Experiments Research Center (NCERC): Delayed Critical through Prompt Critical
【24h】

Godiva Ⅳ Startup at National Criticality Experiments Research Center (NCERC): Delayed Critical through Prompt Critical

机译:美国国家关键性实验研究中心(NCERC)的GodivaⅣ初创公司:从关键到及时的关键

获取原文
获取原文并翻译 | 示例
       

摘要

Godiva Ⅳ is a fast burst assembly with approximately 65 kg of highly enriched uranium fuel alloyed with 1.5% molybdenum for strength. In 2012, the core for the Godiva Ⅳ critical assembly machine was reassembled and loaded onto the refurbished stand at the Device Assembly Facility (DAF) at the Nevada National Security Site (NNSS) as shown in Figure 1. The process was described at the 2013 American Nuclear Society Winter Meeting.
机译:GodivaⅣ是一种快速爆破组件,含有约65 kg的高浓铀燃料和1.5%钼合金化,强度高。 2012年,GodivaⅣ关键组装机的核心被重新组装,并装载到内华达国家安全局(NNSS)的设备组装厂(DAF)的翻新台架上,如图1所示。该工艺在2013年进行了描述美国核学会冬季会议。

著录项

  • 来源
    《Transactions of the American nuclear society》 |2014年第11期|788-790|共3页
  • 作者单位

    Los Alamos National Laboratory: P.O. Box 1663, Los Alamos, NM, 87544;

    Los Alamos National Laboratory: P.O. Box 1663, Los Alamos, NM, 87544;

    Los Alamos National Laboratory: P.O. Box 1663, Los Alamos, NM, 87544;

    Los Alamos National Laboratory: P.O. Box 1663, Los Alamos, NM, 87544;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:58:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号