...
首页> 外文期刊>Transactions of the American nuclear society >ZionSolutions Dry Cask Storage Project / Supporting Fuel Transfer
【24h】

ZionSolutions Dry Cask Storage Project / Supporting Fuel Transfer

机译:ZionSolutions干桶储存项目/支持燃料转移

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The ZionSolutions dry fuel transfer project is well underway with 22 fuel casks on the ISFSI pad and 39 fuel casks more to go. At the current loading rate, fuel transfer should be completed early in the 1st Quarter of 2015. Loading of the Unit 2 GTCC casks is planned for this summer and the Unit 1 GTCC casks for this fall. While this summary focuses on the role of fuel engineering in support of the fuel loading process, it is the combined effort and expertise of Fuel Transfer Operations, Fuel Engineering, Licensing - and all the supporting groups on site - Operations, Radiation Protection, Security that share in the successful loading to date.
机译:ZionSolutions干式燃料转移项目进展顺利,ISFSI垫上有22个燃料桶,还有39个燃料桶要去。以目前的装载速度,燃料转移应在2015年第一季度初完成。计划在今年夏天装载2号GTCC桶,在今年秋天装载1号GTCC桶。尽管本摘要着重于燃料工程在支持燃料装载过程中的作用,但正是燃料转移运营,燃料工程,许可-以及所有现场支持小组-运营,辐射防护,安全的共同努力和专业知识共享迄今为止的成功加载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号