首页> 外文期刊>Transactions of the American nuclear society >Nuclear Power Plant Control Room Modernization - Simulation Based Design
【24h】

Nuclear Power Plant Control Room Modernization - Simulation Based Design

机译:核电站控制室现代化-基于仿真的设计

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

As many plants age and equipment modifications are implemented, the industry has the opportunity to address the issue of control room obsolescence through technology application and enhanced engineering techniques using existing systems. This paper addresses the practice of Simulation Based Design (SBD) for control room modernization driven by plant modifications and upgrades.
机译:随着许多工厂老化和设备改造的实施,行业中有机会通过使用现有系统的技术应用和增强的工程技术来解决控制室过时的问题。本文讨论了基于仿真的设计(SBD)的实践,该仿真用于工厂改造和升级驱动的控制室现代化。

著录项

  • 来源
    《Transactions of the American nuclear society》 |2017年第1期|306-306|共1页
  • 作者单位

    Idaho National Lab, U.S. Department of Energy GSE Systems, Inc., 1332 Londontown Blvd. Suite 200, Sykesville, MD 21784;

    Idaho National Lab, U.S. Department of Energy GSE Systems, Inc., 1332 Londontown Blvd. Suite 200, Sykesville, MD 21784;

    Idaho National Lab, U.S. Department of Energy GSE Systems, Inc., 1332 Londontown Blvd. Suite 200, Sykesville, MD 21784;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号