Enlargement of the Marienplatz metro station - a complex tunnel project beneath Munich City Hall

机译:玛利亚广场地铁站的扩建-慕尼黑市政厅下的复杂隧道项目

获取原文
获取原文并翻译 | 示例
       

摘要

Due to expected capacity requirements for public transport during the 2006 Football World Cup, it was decided to enlarge the metro station Marienplatz, situated right beneath Munich city hall. The project concept finally approved provides for two extra tubes running in parallel to the existing ones. By connecting the new and old tubes with 11 cross cuts each approximately 3.10m wide, an intended doubling of the platform passenger capacity is achieved. The close vicinity of the new tunnel tubes to existing buildings - in particular the historic city hall 'Neues Rathaus' that was erected from 1867 to 1909 - puts a high demand on control and limitation of the soil movements to be expected during the construction process. While the original bid invitation proposed a lowering of the groundwater level, the solution finally chosen uses an innovative brine freezing technique, a specific proposal made by the executing consortium. As the analysis covers numerous non-linear construction stages involving parametric studies, it was essential to have a fast solution technique. On the other hand, simulation of the cross cutting process is a complex non-linear three-dimensional problem. Aiming at the best compromise between efficiency and required accuracy, a novel concept was adopted. It started with a classical two-dimensional finite element analysis of representative cross-sections using standard and approved techniques but was extended to account for the three-dimensional stress redistribution effects occurring during tunnel excavation. A special combined mesh generation and mapping technique is applied to create a three-dimensional model that inherits the load history induced by the tunnelling process and thus allows for simulation of the cross cut installation process. This combined approach enables the complex analysis task to be performed within a reasonable timeframe.
机译:由于在2006年世界杯足球赛期间对公共交通的预期载客量需求,因此决定扩大位于慕尼黑市政厅正下方的玛利亚广场地铁站。最终批准的项目概念提供了两个与现有管道平行运行的额外管道。通过将新的和旧的管道连接到11个横切面,每个横切面大约3.10m宽,可实现平台载客量的预期翻倍。新的隧道管紧邻现有建筑物,尤其是历史悠久的市政厅“ Neues Rathaus”(建于1867年至1909年),对控制和限制在施工过程中预期的土壤运动提出了很高的要求。虽然最初的招标书建议降低地下水位,但最终选择的解决方案是使用创新的盐水冷冻技术,这是由执行中的财团提出的具体提议。由于分析涵盖涉及参数研究的众多非线性构造阶段,因此拥有快速求解技术至关重要。另一方面,横切过程的模拟是一个复杂的非线性三维问题。为了在效率和所需精度之间取得最佳折衷,采用了一种新颖的概念。它从使用标准技术和经认可的技术对代表性横截面进行经典的二维有限元分析开始,但后来扩展到考虑了在隧道开挖过程中发生的三维应力再分布效应。应用了一种特殊的组合网格生成和映射技术来创建三维模型,该模型继承了隧穿过程引起的载荷历史,因此可以模拟横切安装过程。这种组合的方法使复杂的分析任务可以在合理的时间范围内执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号