1.1 The right attitude is essential. The design team must trust each other and have a strong relationship. If that trust exists, then collaboration through BIM can further enhance relationships. If it doesn't exist then true BIM collaboration is unlikely 1.2 An SME can successfully implement BIM on projects; even large, complex ones. It takes care and deliberate planning, as well as a design team that is willing to accommodate each other's needs. Training and staff skills profiling when putting together the team are essential 1.3 Planning is key. Integrated BIM models require upfront investment of time for later benefits. The process needs to be thought through and agreed with the team at an early stage 1.4 The more team members involved, the greater the potential benefits of integrated BIM. The biggest rewards could be achieved by actively carrying the building information models through to construction and facilities management, which requires the client and contractor to also buy in to the process 1.5 Undoubtedly there are time, cost and quality benefits that can be achieved for clients, designers and contractors through use of BIM, if it is carefully planned.
展开▼