首页> 外文期刊>Railway magazine >MHR steps up pace of Ropley development
【24h】

MHR steps up pace of Ropley development

机译:MHR加快Ropley开发的步伐

获取原文
获取原文并翻译 | 示例
       

摘要

The new boiler shop at the Mid-Hants Railway's Ropley MPD (beyond the existing open-ended boiler works) has been erected and two roads have been laid inside.rnConcreting of the floor is due to be completed during October and it should be fully operational by January.rnAlthough the intention had been to pause after completing this element of the HLF-backed development, the MHR has opted to move immediately to phase 2 - a new carriage and wagon shop - thanks to arnlegacy and the 2009 financial results being good.
机译:已在Mid-Hants铁路的Ropley MPD建造了新的锅炉车间(除了现有的不限成员名额的锅炉​​工程之外),并在其中铺设了两条道路。rn地板的混凝土将在10月完成,并且应该可以全面运行尽管原本打算在完成由HLF支持的开发工作的这一部分后暂停,但由于学识渊博且2009年财务业绩良好,MHR选择立即进入第二阶段-新的马车和货车商店。

著录项

  • 来源
    《Railway magazine》 |2009年第1303期|69-69|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:33:43

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号