首页> 外文期刊>Railway magazine >Cambrian revival - trust and society secure leases
【24h】

Cambrian revival - trust and society secure leases

机译:寒武纪复兴-信任与社会保障租赁

获取原文
获取原文并翻译 | 示例
       

摘要

The Cambrian Railways Trust and the Cambrian Railways Society each completed leases for sections of the Gobowen to Blodwell line from Shropshire County Council on April 1. This follows agreement between the trust and society on how they will jointly work towards reviving sections of this one-time Cambrian Railways route (RM May). The trust will extend its existing Cambrian Heritage Railway line (based at Llynclys South) to Oswestry, while the society will develop the line from Llynclys Jet towards Blodwell via Porthywaen.
机译:寒武纪铁路信托公司和寒武纪铁路协会分别于4月1日完成了从什罗普郡县议会获得的Gobowen至Blodwell线各部分的租赁。这是在该信托与社会之间达成协议后,双方将共同努力恢复这一一次性项目的一部分。寒武纪铁路路线(5月RM)。该基金会将其现有的寒武纪遗产铁路线(位于Llynclys South)延伸至Oswestry,同时该协会还将开发这条线,从Llynclys Jet经由Porthywaen通往Blodwell。

著录项

  • 来源
    《Railway magazine》 |2009年第1298期|53-53|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:33:30

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号