首页> 外文期刊>Railway magazine >Eastleigh: Opening day sold out already
【24h】

Eastleigh: Opening day sold out already

机译:伊斯特利:开放日已经售罄

获取原文
获取原文并翻译 | 示例
       

摘要

As we closed for press with less than a month to go, the Eastleigh Works Centenary event of May 23-25 was heading towards a sell-out. During April, all pre-allocated tickets for the opening day on Saturday sold out, but there are still advance tickets for Sunday and bank holiday Monday, and organisers were recommending those as the council car parks are free on those days. Over the three-day event, it is expected that more than 10,000 visitors will attend, attracted by more than 50 steam, diesel and electric locomotives. See the souvenir programme presented with this issue for details.
机译:当我们关闭新闻发布会还不到一个月的时间时,5月23日至25日的伊斯特利工厂百年纪念活动即将售罄。在4月份,周六开放日的所有预分配票都售罄,但周日和周一银行假日仍然有预售票,组织者建议使用,因为当日的议会停车场是免费的。在为期三天的活动中,预计将有10,000多名参观者参加,并吸引了50多种蒸汽机车,柴油机车和电力机车。有关详细信息,请参阅随此问题一起提供的纪念品计划。

著录项

  • 来源
    《Railway magazine》 |2009年第1298期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:33:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号